CTRL 350 Medway Crossing, Essex, UK
 
Synopsis:
Analysis and checking of the viaducts
Contractor:
Eurolink Joint Venture
End Client:
Union Railways (South)
Award:
British Construction Industry Awards 1995, The Concrete Society Awards 1995

The Channel Tunnel High Speed Rail Link crosses the Medway estuary by a major viaduct, comprising two launched segmental post-tensioned concrete approach viaducts, totalling approximately 900 m in length and an insitu concrete post-tensioned balanced cantilever main span section totalling 380 m, with a 190 metre maximum span.

Tony Gee undertook analysis and design checks for the launched viaducts.

Quick Links
 CTRL 350, Medway Crossing