Jamuna Bridge, Tangail, Bangladesh

Design of bridge deck unit casting cells, deck erection gantry and all other principal items of temporary works used in the deck construction
Hyundai Engineering and Construction Co.
End Client:
Jamuna Multi-Purpose Bridge Authority

A World Bank Organisation funded project to provide a road and rail link along the Sirajganj corridor over the Jamuna River.

Tony Gee designed the deck erection gantry for this multispan main bridge with a prestressed concrete box girder superstructure (4.8 km long with 100 m spans), built in balanced cantilever, supported on raked steel piles up to 90 m long.

Quick Links
Jamuna Bridge