Transport Scotland outlined plans to improve a 0.5km stretch of the A82 road with a new offline 168m long – six span viaduct running parallel to Loch Lomond shoreline, followed by a section of online widening with a cutting into the existing rock headland. The design and build solution adopted offered a road remaining open to traffic during the day for the majority of construction period. Tony Gee was appointed to deliver the challenging detailed design for the new viaduct including associated highway and earthworks.

The design and construction of the A82 road improvement at Pulpit Rock has been a real achievement considering the site specific constraints.

PROJECT DETAILS

SynopsisDetailed design and construction supervision of box girder viaduct and associated highway and geotechnical works
ContractorMcLaughlin & Harvey Ltd
End ClientTransport Scotland
Sectors and ServicesHighways & Infrastructure
Permanent works design
More projects
AwardsSaltire Society Civil Engineering Awards 2016 – Infrastructure

Project Gallery