The Channel Tunnel High Speed Rail Link crosses the Medway estuary by a major viaduct, comprising two launched segmental post-tensioned concrete approach viaducts, totalling approximately 900 m in length and an insitu concrete post-tensioned balanced cantilever main span section totalling 380 m, with a 190 metre maximum span.
Tony Gee undertook analysis and design checks for the launched viaducts.